Upcoming Jobs

List of Jobs to be tackled Spring 2019:

  1. Recoat with VC17
  2. Polish/ Wax hull
  3. Epoxy inside of swim platform
  4. Install rebuilt swim platform and add burke davits to carry dingy
  5. Waterproof newly repaired bimini and tonneau cover
  6. Add snaps to newly trimmed and repaired window covers
  7. Replace forward bilge pump
  8. Install new 200W solar system on bimini
  9. Replace 20 amp circuit (suspected to be weak) on 110v panel

List of jobs to be tackled Spring 2018:

  1. Add 2 new 40W solar panels (Coleman)
  2. Replace manual toilet with new one (Jabsco Twist N Lock Manual)
  3. Build gin pole and lower mast by hand (Looking for lots of suggestions on this one!)
  4. Secure wiring inside mast to stop it from banging (Any ideas out there?)
  5. Install VHF (Standard Horizon GX1300) and masthead antenna (Glomex 3db)
  6. Install new anchor (Rocna Vulcan 12) and find a suitable roller (Anyone know a good reasonable option?)
  7. Replace wire to rope jib halyard and masthead sheave
  8. Add another coat of VC17 to the bottom before launch
  9. Install Lazy Jacks (3-Fall Adjustable System)

I am sure this list will continue to grow! Leave lots of comments with advice or suggestions please!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s